Customization: | Available |
---|---|
Type: | Round |
Standard: | AISI, ASTM, DIN, JIS, GB |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Oil Pipeline main use carbon steel pipe, carbon steel pipe according to the manufacturing method be divided into seamless steel pipe and welded steel pipe, Welded pipe include ERW pipe LSAW pipe and SSAW pipe. As the professional factory we have support our clients finished many large petroleum projects. Any type pipe and can be get from us.
Standard |
API 5L PSL1 , API 5L PSL2 , ASTM A333 ASTM A106 , ASTM A53, JISG3444,STPG410,ASTM A335.GB/T 9711-2017 |
Materials |
Gr.B, X42, X52, X60, X65, X70, X80, Gr.6,Gr.A,Gr.B,Gr.C, STK290, STK400, STK490, STK500, STK540, STS370, STS410, STS480, STPT370,STPT410, STPT480, K55, J55, L80, N80, P110, Q125, P5, P9, P11, P12, P21, P22, P23 |
Size range |
OD: 21.3-1447.8mm WT: 4-60mm Length: 5.8m, 6m, 11.8m, 12m or as customer required. |
Ends |
Plain end, Beveled end, Threaded ends with coupling or without coupling. |
Surface Treatment |
1.Bare pipe, 2.Varnish coating/oil, 3.Black painting, 4.3LPE, 3PP, FBE, Epoxy Zinc-rich Primer, Liquid Epoxy Resin, etc 5. According to clients requirement |
Package |
plastic caps or metal protectors, with hexagonal bundled or loose packing. |
Technique |
Hot rolling, Cold drawing, Hot expanding, LSAW, JOCE, UOE, RBE. |
Inspection |
1.leakage magnetic, 2.UT, 3.X-Ray,4.hydraulic pressure. |
Application:
Besides used in Oil Pipeline, the pipe also could used for water pipeline, gasoline pipeline, natural gas pipeline, jet fuel pipelines, water and sewage pipeline, mineral slurry pipeline, submarine pipelines, onshore and offshore pipeline, line pipe pile.
Shipment:
a) Length: ≤5.8m, loaded in 20GP Container, Max 26.5tons.
b)Length: ≤11.85m, loaded in 40 GP/HQ Container, Max 27tons.
c) Length: ≥12m, be shipped by bulk vessel. FILO terms.
Note: The pipe OD also will effect the weight of load in container.
d) Delivery time: about 25-30 days after received your advance payment.
Why Choose Us:
1.Rich Experience in supplying large oilfield projects abroad.
2.Advanced equipment ensures that every link is completed fabrication with high quality.
3.Professional technical team to help you solve any problems any time.
4.Several production lines work simultaneously to ensure delivery on time.
5.Excellent service make your order be finished in a good heart.
Lead time 10-15 days | 80% of output for export
Shipping Information
FOB Port | Tianjin | ||||
---|---|---|---|---|---|
Weight per Unit | 1500.0 Kilograms | ||||
HTS Code | 7304.41.90 00 | ||||
Export Carton Dimensions L/W/H | 11.8 x 1.0 x 0.8 Meters |
Lead Time | 15-30 days | ||||
---|---|---|---|---|---|
Dimensions per Unit | 11.8 x 1.0 x 0.8 Meters | ||||
Units per Export Carton | 25.0 | ||||
Export Carton Weight | 1500.0 Kilograms |